Telkom - Pretoria East Ridge

Telkom · Model A · Bronze SLA

Breaker ON
Total Power

9.3kW

Total Current

24.2A

Energy Today

145.1kWh

Capacity Used

0%

Phase Imbalance

1.9%

Current Limit

63A

Per-Phase Breakdown

PhaseVoltage (V)Current (A)Power (kW)% of LimitStatus
L1 (Red)234.024.703.1639%NORMAL
L2 (Yellow)234.524.003.0738%NORMAL
L3 (Blue)234.424.003.0738%NORMAL
Total24.209.30

Per-Phase Current History

No telemetry data available for this time range

Phase Balance

L1 CurrentL2 CurrentL3 CurrentL1 PowerL2 PowerL3 Power07142128
1.9% Imbalance

Capacity Utilization

0%

9.3 / 0.0 kW

12-Month Capacity Forecast

May 26Jun 26Jul 26Aug 26Sept 26Oct 26Nov 26Dec 26Jan 27Feb 27Mar 27Apr 270kW3kW6kW9kW12kW
  • Capacity Limit
  • Projected Load

Based on 2% monthly growth rate. Current headroom: -9.3 kW

Recommended Actions

ALL CLEAR
🟢

Phases Well Balanced

success

All three phases within 1.9% of each other. Maximum deviation is 0.47A from average.

Action:

No action required. Continue monitoring during load changes.

🟢

Adequate Capacity Headroom

success

Operating at 0% with -9.3 kW available. Sufficient margin for growth.

Action:

No immediate upgrade needed. Review in 6 months.

Power Consumption History (Site-Level)