OP

MTN - Pretoria East Ridge

MTN · Model B · Gold SLA

Breaker ON
Total Power

8.9kW

Total Current

23.1A

Energy Today

138.8kWh

Capacity Used

89%

Phase Imbalance

2.0%

Current Limit

63A

Per-Phase Breakdown

PhaseVoltage (V)Current (A)Power (kW)% of LimitStatus
L1 (Red)235.023.603.0337%NORMAL
L2 (Yellow)234.022.902.9436%NORMAL
L3 (Blue)233.522.902.9436%NORMAL
Total23.108.90

Per-Phase Current History

No telemetry data available for this time range

Phase Balance

L1 CurrentL2 CurrentL3 CurrentL1 PowerL2 PowerL3 Power06121824
2.0% Imbalance

Capacity Utilization

89%

8.9 / 10.0 kW

12-Month Capacity Forecast

May 26Jun 26Jul 26Aug 26Sept 26Oct 26Nov 26Dec 26Jan 27Feb 27Mar 27Apr 270kW3kW6kW9kW12kW
  • Capacity Limit
  • Projected Load

Based on 2% monthly growth rate. Current headroom: 1.1 kW

Recommended Actions

1 WARNING
🟢

Phases Well Balanced

success

All three phases within 2.0% of each other. Maximum deviation is 0.47A from average.

Action:

No action required. Continue monitoring during load changes.

🟡

Capacity Planning Required

warning

At 89% utilization with 2% monthly growth, capacity will be reached in approximately 6 months.

Action:

Schedule breaker upgrade to 95A within the next 4 months. Review load-shedding schedule for peak management.

Power Consumption History (Site-Level)

No telemetry data available