Global Search

Search across sites, tenants, alerts, and pages

OP

Telkom - Rustenburg Mine Belt

Telkom · Model A · Bronze SLA

Breaker ON
Total Power

4.8kW

Total Current

12.5A

Energy Today

74.9kWh

Capacity Used

0%

Phase Imbalance

2.1%

Current Limit

63A

Per-Phase Breakdown

PhaseVoltage (V)Current (A)Power (kW)% of LimitStatus
L1 (Red)234.312.801.6320%NORMAL
L2 (Yellow)233.912.401.5820%NORMAL
L3 (Blue)235.612.401.5820%NORMAL
Total12.504.80

Per-Phase Current History

No telemetry data available for this time range

Phase Balance

L1 CurrentL2 CurrentL3 CurrentL1 PowerL2 PowerL3 Power0481216
2.1% Imbalance

Capacity Utilization

0%

4.8 / 0.0 kW

12-Month Capacity Forecast

May 26Jun 26Jul 26Aug 26Sept 26Oct 26Nov 26Dec 26Jan 27Feb 27Mar 27Apr 270kW3kW6kW9kW12kW
  • Capacity Limit
  • Projected Load

Based on 2% monthly growth rate. Current headroom: -4.8 kW

Recommended Actions

ALL CLEAR
🟢

Phases Well Balanced

success

All three phases within 2.1% of each other. Maximum deviation is 0.27A from average.

Action:

No action required. Continue monitoring during load changes.

🟢

Adequate Capacity Headroom

success

Operating at 0% with -4.8 kW available. Sufficient margin for growth.

Action:

No immediate upgrade needed. Review in 6 months.

Power Consumption History (Site-Level)

No telemetry data available