Vodacom - Bloemfontein Central

Vodacom · Model B · Platinum SLA

Breaker ON
Total Power

6.7kW

Total Current

18.0A

Energy Today

104.5kWh

Capacity Used

67%

Phase Imbalance

2.2%

Current Limit

63A

Per-Phase Breakdown

PhaseVoltage (V)Current (A)Power (kW)% of LimitStatus
L1 (Red)231.718.402.2829%NORMAL
L2 (Yellow)233.217.802.2128%NORMAL
L3 (Blue)232.417.802.2128%NORMAL
Total18.006.70

Per-Phase Current History

No telemetry data available for this time range

Phase Balance

L1 CurrentL2 CurrentL3 CurrentL1 PowerL2 PowerL3 Power05101520
2.2% Imbalance

Capacity Utilization

67%

6.7 / 10.0 kW

12-Month Capacity Forecast

May 26Jun 26Jul 26Aug 26Sept 26Oct 26Nov 26Dec 26Jan 27Feb 27Mar 27Apr 270kW3kW6kW9kW12kW
  • Capacity Limit
  • Projected Load

Based on 2% monthly growth rate. Current headroom: 3.3 kW

Recommended Actions

ALL CLEAR
🟢

Phases Well Balanced

success

All three phases within 2.2% of each other. Maximum deviation is 0.40A from average.

Action:

No action required. Continue monitoring during load changes.

🟢

Adequate Capacity Headroom

success

Operating at 67% with 3.3 kW available. Sufficient margin for growth.

Action:

No immediate upgrade needed. Review in 6 months.

Power Consumption History (Site-Level)

No telemetry data available