Total Power

8.0kW

Total Current

22.3A

Energy Today

124.8kWh

Capacity Used

80%

Phase Imbalance

1.8%

Current Limit

63A

Per-Phase Breakdown

PhaseVoltage (V)Current (A)Power (kW)% of LimitStatus
L1 (Red)231.622.702.7236%NORMAL
L2 (Yellow)232.022.102.6435%NORMAL
L3 (Blue)229.722.102.6435%NORMAL
Total22.308.00

Per-Phase Current History

No telemetry data available for this time range

Phase Balance

L1 CurrentL2 CurrentL3 CurrentL1 PowerL2 PowerL3 Power06121824
1.8% Imbalance

Capacity Utilization

80%

8.0 / 10.0 kW

12-Month Capacity Forecast

May 26Jun 26Jul 26Aug 26Sept 26Oct 26Nov 26Dec 26Jan 27Feb 27Mar 27Apr 270kW3kW6kW9kW12kW
  • Capacity Limit
  • Projected Load

Based on 2% monthly growth rate. Current headroom: 2.0 kW

Recommended Actions

1 WARNING
🟢

Phases Well Balanced

success

All three phases within 1.8% of each other. Maximum deviation is 0.40A from average.

Action:

No action required. Continue monitoring during load changes.

🟡

Capacity Planning Required

warning

At 80% utilization with 2% monthly growth, capacity will be reached in approximately 13 months.

Action:

Schedule breaker upgrade to 95A within the next 11 months. Review load-shedding schedule for peak management.