Global Search

Search across sites, tenants, alerts, and pages

OP

Vodacom - Stellenbosch Ridge

Vodacom · Model B · Platinum SLA

Breaker ON
Total Power

3.2kW

Total Current

8.3A

Energy Today

49.9kWh

Capacity Used

32%

Phase Imbalance

2.4%

Current Limit

63A

Per-Phase Breakdown

PhaseVoltage (V)Current (A)Power (kW)% of LimitStatus
L1 (Red)232.88.501.0913%NORMAL
L2 (Yellow)232.68.201.0613%NORMAL
L3 (Blue)234.58.201.0613%NORMAL
Total8.303.20

Per-Phase Current History

No telemetry data available for this time range

Phase Balance

L1 CurrentL2 CurrentL3 CurrentL1 PowerL2 PowerL3 Power036912
2.4% Imbalance

Capacity Utilization

32%

3.2 / 10.0 kW

12-Month Capacity Forecast

May 26Jun 26Jul 26Aug 26Sept 26Oct 26Nov 26Dec 26Jan 27Feb 27Mar 27Apr 270kW3kW6kW9kW12kW
  • Capacity Limit
  • Projected Load

Based on 2% monthly growth rate. Current headroom: 6.8 kW

Recommended Actions

ALL CLEAR
🟢

Phases Well Balanced

success

All three phases within 2.4% of each other. Maximum deviation is 0.20A from average.

Action:

No action required. Continue monitoring during load changes.

🟢

Adequate Capacity Headroom

success

Operating at 32% with 6.8 kW available. Sufficient margin for growth.

Action:

No immediate upgrade needed. Review in 6 months.

Power Consumption History (Site-Level)

No telemetry data available